Dolphin School – Bristol

Dolphin School – Bristol

This was Phase II of the building of Primary school, located in an inner-city area of Bristol.

Total construction build was £45million, and this phase of the building was March – December 2016

The school is in an area surrounded by buildings so space is at a premium and was creatively utilised to include outside play areas on the roof of the building.

Fire Defence Servicing designed and installed the dry riser and fire sprinkler system to protect the building to OH-1 complete with 1no GRP Tank and Electric Duty pump.

We completed the project on time and within budget.