Project Description
The Brief
To design, supply, install and commission extension to the existing sprinkler system, to feed 3 new classrooms and MUGA.
The Solution
FDS Installed a Fully hydraulically-calculated extension to the existing system with 49 sprinkler heads connecting to the existing system via 80mm connection within the corridor.
Project Location: Filtch Green Academy, Dunmow
Client: Beardwell Construction
Project Value: £12,000.00
Completion: June 2017