Project Description

The Brief

To design, supply and install pipework and alarm valves into new store.

The Solution

CDS group opened a new Range store within a disused buildingpreviously a Tesco site. FDS completed the design and installation of the pipework and alarm valves within the building and pressure tested the system. 

FDS supplied an electric pump, diesel pump, 2no sprinkler tanks and a GRP pump house. 

Project Location: Range Maynooth

Client: John Graham Construction Ltd

 Project Value: £202,734.00

 Completion: November 2018