Project Description

The Brief

Design and installation of a new sprinkler system.

The Solution

New 6th form building was built and FDS installed an OHIII sprinkler protection to BS12845 using the existing pump & tank from the main school 150meters of underground main installed form existing water supplier to the new building. 1 Wet alarm valve & 2zone check units along with 250 void and false ceiling sprinkler heads were installed within the 6th form building.

Project Location: The Wellington Academy

Client: Bray & Slaughter

 Project Value: £68,000.00

 Completion: July 2015