Project Description

The Brief

Following a fire, FDS were employed to disconnect the damaged diesel pump from the system, remove and replace the damaged pipework, fittings, and initiation board within the pump house. 

The Solution

A pump engineer on behalf of FDS serviced the remaining 3 diesel pumps, replaced the batteries and electrical connections to one pump and the wiring to the 3 pumps where fire damaged the cables. 

The pump house & underground main were being pressure tested when it was visible that the gate valves within the 2 hangers were letting by. 

FDS supplied & fitted new gate valves, service kits for the alarm valves then completed a pressure test including the underground main. 

On completion of our works, the internal control system was not working and Amey will service & repair where necessary.  

Project Location: Culdrose

Client: Amey Defence

 Project Value: £88,600.40

 Completion: September 2019