A new build development of 132 student accommodation rooms over 8 floors.

Fully designed and installed residential sprinkler system to BS 9251 using CPVC pipe with concealed heads to plasterboard ceilings.

To feed the sprinkler system, a residential riser was installed to the domestic cold water supplies and commissioned.

A dry riser was also designed and installed to BS 9990 by FDS .

Although the project was challenging FDS completed the installation ahead of time.