St James Park – Student Accommodation. Contract Value £150,000.00
The development is part of a wider regeneration project within the St. James Ward which includes upgrades to the Exeter City Football Stadium, St. James Park. The development comprises 312 student beds in a combination of high-quality studio and shared apartments complete with en-suite rooms.
FDS were contracted to provide the design supply and installation of over 1100 residential concealed heads to BS9251 Connected to a shared boosted cold water pump & tank system. The system was installed only using local direct labour and have over was 2 weeks before other trades